Refurbishment Update from Richard for the end of November

IMG_6051.jpg

Orientation: looking from kitchen end of canteen

Windows and entrance doorway have been formed and sections of floors removed for timber inspection and levelling.
First fixed wiring within ceiling void has been installed.

IMG_6076.jpg

Looking from old back door of Canteen various hot and cold water pipes to be supplied from new boiler and hot water cylinder and main water feed to bar and kitchen area. 50mm waste pipes can also be seen. These discharge into existing drains.

IMG_6124.jpg

Drainage outlet

IMG_6074.jpg

Another view of first fixed pipes from the doorway.

IMG_0061.jpg

50mm waste pipe in Bar area along with hot &cold water supplies.
Note the flexible fixing to waste pipe and position of rodding access to ‘tee’.

Two replacement joists have been laid alongside existing joists.
The battens which can be seen fixed underneath the joists at right angles to them are for supporting the rigid underfloor insulation.

IMG_6107.jpg

Floor joists have been levelled and replaced where necessary. 100mm rigid underfloor insulation is being installed prior to new flooring being laid.

IMG_6053.jpg

Excavation for one of two new concrete pads have been dug.

IMG_6106.jpg

Concrete for new pad laid.

IMG_6109.jpg

Work in progress shows the position of the two pads to the left.

The area to the far right shows floor laid over underfloor insulation and the central boarded area being lifted prior to being worked on.